Projects
Pedare Christian College
Project Overview:
In a significant upgrade at Pedare Christian College, Jaymel replaced outdated ducted splits with an advanced Mitsubishi Electric City Multi VRF Heat Recovery System in the Administration Building.
This project also included the integration of a Lossnay Fresh Air System. The entire replacement was strategically implemented over the school’s Christmas holidays, spanning six weeks, to avoid any disruption during the academic year.
Client
Pedare Christian College
Time
6 Weeks
Services Provided
Replacement of High Capacity Ducted Splits
Installation of Mitsubishi Electric City Multi VRF Heat Recovery System
Integration of Lossnay Fresh Air System
Location
Administration Building