Chapley Retail Group | Pasadena Foodland
Projects
Jaymel's HVAC Upgrade for Chapley Retail Group
Project Highlights:
Jaymel’s collaboration with Chapley Retail Group (CRG) marked a significant milestone in energy efficiency and customer experience enhancement for Foodland.
- Energy Efficiency Breakthrough: By replacing outdated APAC units with cutting-edge Temperzone ECONEX PRO rooftop package units, CRG achieved substantial reductions in energy consumption and operating costs. The new system, featuring four-stage inverter compressors and Economy Cycle functionality, ensures optimal energy usage and minimal maintenance costs.
- Fresh Air Revolution: The installation of six Climate Wizard CW-H15S indirect evaporative coolers revolutionized air quality in back-of-house areas. Conditioned, fresh air now stabilizes temperatures across kitchens, bars, and the shopping floor, significantly enhancing the shopping experience.
- Seamless Installation: Jaymel’s strategic planning ensured a smooth transition. Within two days, the team decommissioned the original machines, installed the new equipment, and re-energized the system—all without disrupting Foodland’s operations or customer experience.
- Innovative BMS Integration: The new Building Management System (BMS) was designed to optimize energy management, improve air quality, and ensure maximum operational efficiency, aligning with CRG’s sustainability goals.
- Meticulous Execution: Key aspects included:
- Two after-hours crane lifts to replace equipment without affecting trading.
- Prefabrication of support frames and rooftop ductwork based on precise site measurements.
- Electrical and control upgrades to support the advanced systems.
This project exemplifies Jaymel’s dedication to client-focused solutions, technical excellence, and sustainable practices, solidifying a long-standing partnership with CRG.
This project not only enhanced the environmental sustainability of Tree 4 Life but also provided them with substantial cost savings.
Client
Chapley Retail Group
Time
2 working days (overnight Saturday to Sunday to avoid disruption to operations)
Services Provided
- Complete HVAC system upgrade for Chapley Retail Group.
- Replacement of outdated APAC units with energy-efficient Temperzone rooftop package units.
- Installation of six Climate Wizard CW-H15S systems to enhance air quality and stabilize temperatures.
- Integration of a new Building Management System (BMS) for energy efficiency and optimized operations.
- Prefabrication and engineering modifications to rooftop platforms and ductwork.
- Two after-hours crane lifts to minimize disruption to trading.
- Seamless installation completed within two working days without impacting Foodland’s operations.